There are no products in your shopping cart.
When installing long travel suspension system and/or crossover steering the front drive shaft spline is just not long enough to get the job done. The kit allows a full 8" of slip travel. Made in Japan.
Uses the same U-joint as stock 1984-1995 Pickup & 4Runner. U-joint available separately. This joint makes a good spare for the tool box! Joint is Also Made in Japan
To install, cut the tube from your drive shaft and replace with a length of .095 or .120 wall tubing. Set up the drive shaft so that you have 3" of compression and 5" of extension at ride height.
8/3/9: This part is currently out of stock
$179.00